Tessera Development Status Report

Jun 1, 2026 – Jun 15, 2026
v1 Progress to Beta
Design
Complete
Dev
72% — 30–46h remaining
v2 Progress
Design
83% — 30/36 items
Dev
Not started — 465–680h estimated
⚠ Sandbox Access Required
SDN developer membership pending. 31 items across v1/v2/v3 are sandbox-blocked. Phase 2 deployment (D2 schema + M0 validation) cannot proceed without sandbox access. ~30–46 hrs of v1 dev work gated.
Activity This Period (116 commits · +226,200 / -13,622 lines)
Features12auto-run verification, segment slicing, custom sources, alert engine v2; implement P1 chart shapes + P2 override dropdown; implement U1-U3 User Event scripts + runtime.executionContext (+9 more)
Fixes3wire missing test files into run_tests.sh, reconcile test counts; upgrade sync_master_tracker.py to generate tracker patches; replace FETCH FIRST with ROWNUM in DSO read path
Documentation57integrate ontology v2.1 ConceptFamily expansion into doc package; add design-hours row to dashboard totals, refresh tracker health note; simplify tracker YAML spec, add per-scope dashboard cards (+53 more)
Tests5write FR-DASH and FR-EXP v2 unit tests + pure functions; partial coverage for FR-NFR-04/06 portlet render error path; close RTM gaps via citations, partial notes, 1 discrepancy found (+2 more)
Refactoring1extract admin utils (30 tests) + UI kit shared module
Chores10add doc integrity tools and wire staleness check into build gate; rename ontology parser to .mts to silence module-type warning; add ontology markdown-to-json parser, wire into fix gate (+7 more)
Other27feat add scripts to generate new product roadmap and dev progress or status repo; add official netsuite-suitecloud-sdk claude skills; add cruip tidy website template reference (+24 more)
Session Summaries
2026-06-01 **Focus:** DS-05–DS-10 batch design, tessera_notification.ts, SAFE B1/B2/B3/B8 documentation, path-to-coding refresh
2026-06-01 **Focus:** Port interface completion — adapter stubs, lint/type fixes, build green
2026-06-01 **Focus:** Blocking test files written; doc maintenance pass (DS-05 through DS-10); run_tests.sh updated
2026-06-01 **Focus:** C6/C7 implementation; action register refresh; Track E cleared; architect review archived
2026-06-01 **Focus:** Schema patches, pagination fold, doc cleanup, housekeeping — everything to zero
Quality Dashboard
1,105 (+678)
Tests (24 files, all passing)
SAFE Compliant
1
Vale Errors (8 rules, 1 runs)
Engineering Discipline
CI/CD gate: lint → lint:docs → wikilinks:check → test:registration → depcheck → build → safe-check → tracker:check → stale:check — every commit
Hexagonal Architecture: domain logic behind port interfaces, NS is the adapter
CQRS: write path (Wizard → MDL) fully separated from read path (portlet → R6)
Branded types enforce state machine invariants at compile time
Immutable closed-period results — computed once, stored permanently
SAFE compliance: 4 enforced rules (SELECT *, record mutation in afterSubmit)
Documentation
194 (+45)
Total docs (+33 72 arch)
435
Decisions
30/36
v2 Designed
11-step doc-integration sequence on every design decision
Terminology enforcement via Vale linter (zero-error baseline)
Obsidian vault with Dataview, wikilinks for graph connectivity

Tessera Development Status Report — Detail

Jun 1, 2026 – Jun 15, 2026
Commits This Period (116 total)
Features (12)
2026-06-11(arch) auto-run verification, segment slicing, custom sources, alert engine v2
2026-06-09(portlet) implement P1 chart shapes + P2 override dropdown
2026-06-08(ue) implement U1-U3 User Event scripts + runtime.executionContext
2026-06-08(wizard) implement Step 5 verification + Step 6 sign-off (S2, S3)
2026-06-08E2 AG Grid spike + S4 Registry Catalog Suitelet
2026-06-05(drilldown) add Drill-Down Suitelet — summary table + CSV export
2026-06-05(install) add Install Wizard Suitelet — 9-step setup flow
2026-06-05(wizard) add Metric Wizard Suitelet — Steps 1–4 complete
2026-06-05(admin) extract admin utils + 30 tests
2026-06-05(admin) complete all 8 Admin Console sections
2026-06-05(admin) add Admin Console Suitelet shell with 8-section nav
2026-06-04(crl) add Map/Reduce fleet script — NS adapter layer
Fixes (3)
2026-06-14(test) wire missing test files into run_tests.sh, reconcile test counts
2026-06-14(tooling) upgrade sync_master_tracker.py to generate tracker patches
2026-06-04(portlet) replace FETCH FIRST with ROWNUM in DSO read path
Documentation (57)
2026-06-14(arch) integrate ontology v2.1 ConceptFamily expansion into doc package
2026-06-14(infra) add design-hours row to dashboard totals, refresh tracker health note
2026-06-14(infra) simplify tracker YAML spec, add per-scope dashboard cards
2026-06-14(arch) expand ontology v1.8→v2.1 — full NS workflow coverage + research patches (AI-179, 199-208)
2026-06-14(req) batch FR/test pass for Formula Builder v2 + Multi-Segment NRS
2026-06-14reflow master work tracker v2 table column widths (formatting only)
2026-06-14(tracker) fix stale design-status rows 27/28a/28b
2026-06-14apply pending wikilink conversions in tracker + RTM
2026-06-14(arch) catch up RTM FR-DASH section, master tracker 28c, wikilink pass
2026-06-13(arch) integrate dashboard surfaces design + ontology v1.8 + AIS additions (AI-178-197)
2026-06-13(arch) integrate Formula Builder v2 design (14 decisions)
2026-06-13(schema) rewrite R15 as Named Reporting Scope, add R24 Segment Scope Filter (AI-167)
2026-06-13(arch) integrate multi-segment NRS design (31 decisions)
2026-06-13(ontology) integrate AI-166 pass 2 Component Definitions (29.3/29.7/29.8)
2026-06-13(arch) add multi-segment Named Reporting Scope (NRS) design
+42 more
Tests (5)
2026-06-14(dashboard,export) write FR-DASH and FR-EXP v2 unit tests + pure functions
2026-06-12(rtm) partial coverage for FR-NFR-04/06 portlet render error path
2026-06-12(rtm) close RTM gaps via citations, partial notes, 1 discrepancy found
2026-06-12(v2) 153 unit tests for FR-AR, FR-DIM, FR-ALERT, FR-CSRC
2026-06-04(versioning) add invariant enforcement tests for tessera_versioning.ts
Refactoring (1)
2026-06-05extract admin utils (30 tests) + UI kit shared module
Chores (10)
2026-06-15(infra) add doc integrity tools and wire staleness check into build gate
2026-06-14(infra) rename ontology parser to .mts to silence module-type warning
2026-06-14(infra) add ontology markdown-to-json parser, wire into fix gate
2026-06-14(infra) distribute v2/v3 design hours, fix tracker sync script
2026-06-14(infra) consolidate trackers — 5 files → 3 + dashboard
2026-06-14(infra) gate-check that run_tests.sh covers all test/*_test.ts files
2026-06-14(infra) consolidate skills, add CLAUDE.md, clean up package.json and project instructions
2026-06-13(claude) add shared permission allow/deny config
2026-06-12close GAP-DDD-01 — port boundary enforcement via dependency-cruiser
2026-06-12housekeeping — 1053 tests, patch archive, coverage doc, inventory
Other (27)
2026-06-15feat add scripts to generate new product roadmap and dev progress or status reports, including py and sh scripts, mods t
2026-06-15add official netsuite-suitecloud-sdk claude skills
2026-06-15add cruip tidy website template reference
2026-06-14add html product roadmap v1
2026-06-14t
2026-06-14tracker hours updates for true up. finish obsidian dataview js query for dashboard - working, automatically updating pr
2026-06-14add ppt sample metric block or SPA page layout
2026-06-14add release planning session brief - start working on breaking up dev for v2 and v3 into discrete pieces that can be del
2026-06-14adding script to sum tracker hours into front matter, plus related new lines in package.json
2026-06-14update html mockups from the cleanup work done over in tessera-docs repo. this reflects what is currently live up at gi
2026-06-12(docs) add design hours estimate to v3 design tracker
2026-06-12docs(chore) add V2 coding loe estimates file + small file cleanup
2026-06-12GAP-DDD-01 Closure run via Doc-Integration Patch
2026-06-12docs (chore) delete old test log file from root
2026-06-12docs (chore) clean up patch files
+12 more
Test Suite Breakdown (1,105 tests across 24 files)
File Tests
tessera_crl_test.ts54
tessera_custom_source_test.ts52
tessera_versioning_test.ts41
tessera_alert_evaluator_test.ts38
tessera_autorun_verification_test.ts34
tessera_saga_test.ts31
tessera_admin_utils_test.ts30
tessera_reset_engine_test.ts29
tessera_slice_compute_test.ts29
tessera_dashboard_block_validation_test.ts28
tessera_license_test.ts27
tessera_wizard_preflight_test.ts23
tessera_event_log_test.ts21
tessera_wizard_utils_test.ts19
tessera_crl_invalidation_test.ts18
tessera_query_pagination_test.ts18
tessera_export_utils_test.ts17
tessera_intercompany_test.ts15
tessera_install_test.ts13
tessera_notification_test.ts11
tessera_security_test.ts10
tessera_portlet_cache_test.ts9
tessera_portlet_config_test.ts7
tessera_chart_shapes_test.ts1
New Documentation (107 files added)
docs/10_project/tessera_docs_patch_dan_feedback.md
docs/90_tools/tessera_doc_integrity_tools.md
docs/100_outbound/website/Web Site Template - Cruip Tidy.md
docs/10_project/tessera_release_roadmap.md
docs/10_project/patches/session_action_items_2026-06-14c.md
docs/10_project/release_planning_session_brief.md
docs/10_project/patches/tessera_work_tracker_dashboard_v2.md
docs/10_project/patches/tracker_consolidation_instructions.md
docs/10_project/tessera_tracker_v1.md
docs/10_project/tessera_tracker_v2.md
docs/10_project/tessera_tracker_v3.md
docs/10_project/tessera_work_tracker_dashboard.md
docs/10_project/su_tessera_dashboard_sandbox_validations.md
docs/10_project/su_tessera_research_patch_modules.md
docs/90_tools/skills/commit-memo-SKILL.md
docs/90_tools/skills/netsuite-portlet-params-SKILL.md
docs/10_project/patches/tracker_fixes_and_deferral.md
docs/10_project/patches/session_action_items_2026-06-14.md
docs/10_project/patches/session_action_items_2026-06-14b.md
docs/10_project/patches/tracker_updates_workspace_split.md